Fused Bonded Overlay™
Fused bonded overlay™ is the process of applying an asphalt rejuvenator to the surface of the old asphalt pavement before installing a new coat or overlay of new asphalt. To explain, as a example, when old asphalt is overlaid with a new top coat or layer of asphalt. The rule that cilvl engineers use in the field is for every inch of new asphalt that is laid down over old cracked or broken asphalt, you have a year before the cracks reflect back through the new surface. This reflection of the old cracks up, through and into the new surface is a result of the old pavement expanding and contracting from temperature differences. The new asphalt layer is bonded to the surface of the old asphalt (glued). When a truck or car runs over the pavement the asphalt is designed to flex. The new asphalt as well as the old asphalt moves up and down and side to side. The old crack moves and the attached new asphalt layer starts to give. The crack starts to move up and through the new asphalt surface. This process also is helped along with hot and cold temperatures. The old asphalt moves back and forth from the temperature change. The result is the same pattern of cracks that the client had in the old layer of asphalt shows up with in a year or two in the new asphalt surface. We offer a field proven alternative to our customers.
We offer over 10 years experience of applying rejuvenators to old asphalt roads and parking lots before an overlay is applied. This proven technology is called (Fused boned overlay™). The process starts with edge milling or profile milling the old asphalt surface to prepare it for the new asphalt surface. This milling the process of grinding off a layer of asphalt. This grinding asphalt or millings is returned to asphalt plants and is recycled into new asphalt. The milling is done also to aid in creating a positive flow of water to surface drains. Next, the same day the rejuvenator is applied to the old asphalt and allowed to penetrate into the old asphalt surface for 12 – 16 hours. The next morning the asphalt crew installs the new layer of asphalt over the rejuvenated surface. The new asphalt is installed at 250 degrees. This heated blanket of hot rocks and petroleum (new asphalt layer) super heats the rejuvenating oils in the surface of the old asphalt and fuses the old and new surface together. The heat also fuses the old cracks together. This is in theory. We have done this process for many clients over the past 10 years with great success. We have seen little or no cracks reflect back up into the new asphalt surface with in the first 5 years. We offer a three year performance warranty on any Fused boned overlay™ work. If any cracks develop in the new overlay we will come in and crack seal for “Free” for up to three years after the work. We have seen up to 8 years with little or no cracks in the new asphalt surface.
Fiber Mat
Over the years contractors have used a
bandaid process of installing a fiber mate to the surface of the old pavement before the new asphalt surface is installed. This issue does resist the cracks reflecting through into the new asphalt. The issue we have seen in the field as an example is at 8 years when a client has repairs to make to there asphalt parking lot. Most of the time when a contractor excavates the old broken asphalt and encounters the mat, the contractor can not take the old asphalt back to the asphalt plant to be recycled because the matt is glued to the asphalt and most asphalt plants will not except the matt & asphalt to be recycled. So this old asphalt has to be trucked to the dump and in turn unknown additional fees are passed on to the client. Over all the client is offered a one year warranty for the overlay with the mat installed. Our experience is that it will keep the cracks from coming through into the new surface for up to 5 – 8 years.
Meeting
We offer to meet with you and your company at a scheduled time to apply a free test sample and also for a Lunch and Learn (L&L). We come to a scheduled meeting and bring lunch for you and your team. While you and your team enjoy a free lunch we present an educational power point of the “Why and Benefits of Pavement Maintenance. This presentation runs for 30 – 60 minutes long depending on team questions. So click on the below link and fill out a request form and we will be in contact with you to set up a meeting.



